"Docks In" at Mooredale Sailing Club, Apr 9. Crane lifted dock parts into the water, where people moved them into place.

my dock team fixed bumpers by replacing the worn out carpeting on them. the bumpers consist of a 2 inch by 6 foot wooden board, with some rubber tubbing attached, covered by carpeting.

Apr 10. 1 Notes.

Notes

  1. weyounet posted this